top of page

ACID MINE
DRAINAGE
-
Article from the US Environmental Protection Agency on Acid Mine Drainage
-
Operations Plan for Guysborough Waste Management Facility (Tables indicate what physical and chemical parameters are required to be monitored in the groundwater.)
-
Presentation by Peter Lund: Pitfalls of the Proposed Cochrane Hill Gold Mine Project
-
Impact Area Value of the Cochrane Hill gold mine project. (Visit Fair Mining Collaborative for more info)

Daltech Study Reduction of Arsenic in Effluent Wastewater from 30 ppb to 5ppb
bottom of page